Ardea Resources Limited (ASX:ARL) (OTCMKTS:ARRRF) ("Ardea" or "the Company") is pleased to announce it has engaged engineering firm Simulus to conduct pilot plant trials for the Company's flagship Goongarrie Nickel Cobalt Project ("Goongarrie").

Highlights

- Pilot plant program to derive process design and engineering data for flowsheet to produce nickel sulphate and cobalt sulphate

- Production of commercial samples for testing by potential customers

The pilot plant trial is being completed on 7.5 tonnes of representative mineralisation in the largest laboratory-scale autoclave in the southern hemisphere. The objective of the Research and Development program is to provide process design and engineering data on the planned Goongarrie flowsheet while producing sufficient industry standard specification of cobalt and nickel sulphate crystals. These marketing products will be required as a part of third party due diligence being completed by potential Strategic Partners (ASX Market Release - 14 June 2018).

Commenting on the pilot plant testing, Ardea Chair Katina Law said:

This is an important step in the development of the Goongarrie Nickel Cobalt Project. Piloting of the proposed Goongarrie flowsheet is the next technical step in the research and development programme and will allow Ardea to produce nickel sulphate and cobalt sulphate under operating conditions that mimic a commercial operation and provide marketing samples for eager battery market end users".

To view figures, please visit:
http://abnnewswire.net/lnk/92E8759K


About Ardea Resources Ltd

Ardea Resources Ltd (ASX:ARL) (OTCMKTS:ARRRF) (FRA:A91) is an ASX listed resources company, with 100% controlled Australian based projects, prioritising a three-pronged value creation strategy which is:

- development of the Goongarrie Nickel Cobalt Project, which is part of the Kalgoorlie Nickel Project, a globally significant series of nickel-cobalt deposits which host the largest nickel-cobalt resource in the developed world, coincidentally located as a cover sequence overlying fertile orogenic gold targets;

- advanced-stage exploration at WA gold and nickel sulphide targets within the Eastern Goldfields world-class nickel-gold province; and

- the demerger of the NSW gold and base metal assets with planned in-specie share distribution, with projects located within the Lachlan Fold Belt world-class gold-copper province.

  

Contact

Mr. Brett Clark
Managing Director
Ardea Resources Limited
Tel: +61-8-6244-5136

Media or Investor Inquiries:
Michael Weir
Citadel Magnus
Tel: +61-8-6160-4900



Link: Goongarrie Nickel-Cobalt Project Pilot Plant trials commence


Related Companies

Ardea Resources Ltd


Related Industry Topics: