 |
Mosaic Oil (ASX:MOS) Weekly Operations Update - Surat-Bowen Basin, Qld AUG 19, 2008 10:05 - Article Views: 923 Mosaic Oil's (ASX:MOS)(PINK:MSAOF) MB Century Rig-7 is being moved to the Taylor-19 well site. A mud pump change out will be carried out by the drilling contractor prior to rigging up on the Taylor-19 well. Taylor-19 is expected to be spudded within the week. |
 |
 |
Mosaic Oil (ASX:MOS) West Boggo Creek-1 Drilling Update - Surat-Bowen Basin, Qld AUG 18, 2008 09:18 - Article Views: 823 Mosaic Oil's (ASX:MOS)(PINK:MSAOF) West Boggo Creek-1 exploration well reached total depth of 1987 metres on 16 August 2008. Wireline logs have been run and have confirmed the absence of reservoir quality sandstone in the target Showground Sandstone. |
 |
 |
Mosaic Oil (ASX:MOS) Weekly Operations Update - Surat-Bowen Basin, Qld AUG 12, 2008 11:24 - Article Views: 825 Mosaic Oil (ASX:MOS)(PINK:MSAOF) Announce Weekly Operations Update - Surat-Bowen Basin, Qld; West Boggo Creek-1 (PL 16 - MOS 100%) |
 |
 |
Mosaic Oil (ASX:MOS) Provide Jawsone-1 Drilling Update - Surat-Bowen Basin JULY 21, 2008 10:16 - Article Views: 1,469 Mosaic Oil (ASX:MOS)(PINK:MSAOF) Provide the Jawsone-1 Drilling Update - Surat-Bowen Basin, Qld; Jawsone-1 (PL 15 Farm-out - MOS 75% & Operator, BOW 25%) |
 |
 |
Mosaic Oil (ASX:MOS) Production and Drilling Schedule Update, Surat-Bowen Basin, Qld JULY 3, 2008 11:13 - Article Views: 616 Mosaic Oil (ASX:MOS) has released the production and drilling schedule update, Surat-Bowen Basin, Qld. Net daily production of over 1500 BOEPD achieved in June 2008 against an original target of 1440 BOEPD for July 2008. |
 |
 |
Mosaic Oil N.L. (ASX:MOS) Renewal of Managing Director's Contract JULY 2, 2008 10:39 - Article Views: 739 Mosaic Oil N.L. (ASX: MOS)(PINK: MSAOF) is pleased to announce that it has entered into a new employment agreement with its Managing Director, Mr. Lan Nguyen. |
 |
 |
Mosaic Oil (ASX:MOS) Weekly Operations Update - Surat-Bowen Basin 20080701 JULY 1, 2008 11:00 - Article Views: 537 Mosaic Oil NL (ASX:MOS) advises that as at 0600 hrs (EST) on 1 July 2008 the Waggamba-5H gas and condensate development well was at 3086 metres MD (Measured Depth) (2622.9 metres True Vertical Depth or 2350.2 metres sub-sea) and is currently drilling ahead in 6-1/8" horizontal hole. The forward plan is to continue drilling the 6-1/8" horizontal section to the planned total depth of approximately 3400 metres. |
 |
 |
Mosaic Oil (ASX:MOS) Director Resignation 30 June 2008 JUNE 30, 2008 17:41 - Article Views: 641 The Board of Mosaic Oil N.L. (ASX: MOS)(PINK: MSAOF) announces the resignation of Mr Charles Copeman AM as non-executive director, effective 30th June 2008. |
 |
 |
Mosaic Oil (ASX:MOS) Weekly Operations Update - Surat-Bowen Basin, Qld 20080623 JUNE 24, 2008 10:55 - Article Views: 854 Mosaic Oil NL advises that as at 0600 hrs (EST) on 24 June 2008 the Waggamba-5H gas and condensate development well was at 2668 metres MD (Measured Depth) and is currently drilling ahead in 8-1/2" hole. The forward plan is to continue drilling the 8-1/2" build section to the 7" casing point at approximately 2890 metres. |
 |