Press Releases

Distributed: Feb 19, 2007

Alerts Login

Adelaide, Feb 19, 2007 (ABN Newswire) - Metallica Minerals Limited (ASX: MLM) has commenced its first 2007 drilling programme that will see between 7,000 - 8,000 metres drilled, comprising approximately 400 holes, on its 100% held NORNICO project tenements in North Queensland.

The initial drilling programme is designed to further raise the size and status of its Bell Creek nickel resource, test two exciting EM conductor targets at Kokomo and a new lead-zinc prospect at Silver Hills, NW of Greenvale and approximately 20 km east of the Balcooma Cu-Zn mine.

Step-out resource drilling has commenced this week at Mt Garnet to close off areas around the existing resources at Bell Creek South, North and Northwest to finalise ultimate pit designs.

Additional infill drilling is also required to elevate the majority of the Bell Creek resources to either Indicated or Measured status in preparation for a Bankable Feasibility study due for completion in September 2007. Approximately 3,000 - 4,000m (150 - 200 holes) of drilling has been planned for the Bell Creek nickel deposits.

Approximately 100 holes for 2,000m of drilling is also planned for Lucky Break to close off the nickel mineralisation, to increase the level of confidence in the resource of the Circular Laterite prospect and to sterilise areas of proposed infrastructure development.

Metallica is also planning to undertake exploration drilling at the Silver Hills base metal prospect where soil sampling (using a Field Portable XRF unit) delineated a 900m long by 200m wide Lead (+500ppm) and Zinc (+1000pmm) anomaly - coincident with a sub-cropping northeast - southwest striking gossan. Metallica is planning to drill between 10 - 15 holes at the Silver Hills prospect for approximately 1,000m to test the strike length of the gossan and to determine if the mineralisation continues at depth. This prospect has not previously been drilled.

Metallica also intends to complete additional exploration drilling on the Kokomo tenement to drill test two ground EM conductor anomalies (Kokomo East and West) identified in August - September 2006. The type of mineralisation targeted by this drilling is Cu - Au and or Ni - Cu sulphide mineralisation. This drilling is planned for mid March but timing will be dependant on access after the wet season.

Contact

Peter Gill
Senior Consultant
FIELD PUBLIC RELATIONS

231 South Road
MILE END SA 5031
Tel: 08 8234 9555
Fax: 08 8234 9566
Mb: 0417 784 059
peter@fieldpr.com.au

  Related Companies

>>> Field Public Relations
>>>         Metallica Minerals Limited

  Related Industry Topics:

Mining | 

  This Page Viewed:  (Last 7 Days: 50) (Last 30 Days: 240) (Since Published: 20870) 

Events & Exhibitions

Site Search

 
 ENGLISH   All Languages

Upcoming WebCasts

Mr Mark Paton CEO
Cue Energy Resources
Tuesday, June 12, 2012

Mr Alan Hopkins CEO
Pan Asia Corporation
Tuesday, June 12, 2012

Mr Barry Dawes
Martin Place Securities
Tuesday, June 12, 2012

Dr Andrea Grant CEO
Living Cell Technologies
Monday, July 02, 2012


Webcast Your Annual General Meeting

Mobile Video TV

qrcode
Scan with your Mobile Phone to view ABN Newswire Video Channel on Mobile
 
City Index - A Better Way To Trade