Make ABN Newswire your homepage | Add to Favourites
 CHINESE SIMPLE   CHINESE TRAD     JAPANESE     KOREAN
 ENGLISH    ARABIC    EUROPE
 
  Home    |   Media Partners    |    About Us   |   Contact Us
 
Home News
 

Brisbane, Jan 16, 2008 (ABN Newswire) - The Directors of Arrow Energy Ltd (Arrow)(ASX: AOE) are pleased to announce a substantial reserves upgrade of the Tipton West (Tipton) Field (Arrow 60%, Beach Petroleum 40%) as part of an ongoing multi-field certification program in the Surat Basin. Other Surat reserves increases are expected in the coming months.

At the Tipton Field 1P reserves have increased by 560% and 2P reserves by 68%. The new levels are as follows:
-------------------------------------------------------------
   Tipton Reserves  Previous Tipton   Arrow Net   Total Arrow 
   Revised Jan 2008  Reserves June     Tipton    Net Reserves
      Jan 2008         June 2006      Jan 2008    Jan 2008
          PJ              PJ             PJ           PJ
-------------------------------------------------------------
1P       167              25             100          171
2P       293             174             176          791
3P      2316            2265            1390         2790
-------------------------------------------------------------
The reserves upgrade is predominately as a result of development drilling and continued strong production trends in the field.

Overall, production from Arrow's Surat basin projects continues to increase with the current gross field production rates from Arrow operated fields of 38 mmcfd and Arrow net sales of approximately 23 TJ/D. Combined Surat production levels have increased by a further 10% in the last two months. This performance will, in turn, lead to further reserve upgrades.

The Tipton reserves upgrade also include Tarooms coal seam reserves in the 2P category for the first time. The Tipton JV is in the early stages of two pilots in the Tarooms. The two Tarooms pilots are extremely encouraging and are currently producing a total of nearly 2 mmcfd with the rate continuing to increase. These Tarooms certifications provide further confidence that reserves will be added from on-going Tarooms work on Kogan and Daandine. Certification of Tarooms reserves are of particular value as development of the Tarooms will require significantly reduced investment through sharing of infrastructure with existing, co-located Juandah seams wells.


Commenting on the continuing reserves and production growth in the Surat, Arrow Chief Executive Nick Davies said "All of our Surat fields are now approaching or surpassing field production expectations. We now have wells producing more than 1mmcfd in both Kogan and Tipton fields with continued positive trends. We have always believed the wider spaced wells we are using in the Surat would lead to a gradual build up to a sustainable production level for optimal investment.

As we step out from the initial development areas we continue to expand our reserves base and refine our well completion techniques."

"The early success of the Tarooms pilots is particularly exciting as it will allow maintenance well drill and expansion of the existing fields to occur at significantly reduced capital cost by using the existing gas gathering and water handling infrastructure and well site equipment" added Mr Davies.

Reserves certification work for Daandine and the areas between the Tipton and Daandine Field and for the Meenawarra area to the south of Tipton is also currently underway. Reserves exploration and appraisal and Moranbah Gas Project reserves recertification work are also underway in the Bowen Basin.


About Arrow Energy Limited

Arrow Energy is a coal seam gas (CSG) company focused on the exploration and development of CSG resources in South and Central Queensland and Northern New South Wales. Arrow has first gas sales commencing from the Kogan North field in early 2006 and plans to have three fields (Kogan North, Tipton West and Daandine) on stream by early 2007, producing 44 TerraJoules per day (TJ/d) gross, 33 TJ/d net equivalent to annualised sales of 12 PJ net.

The development of these three fields forms the initial phase of Arrow's plan to produce 45 PJ per annum gross by 2010. Arrow has eight other projects under various stages of appraisal to follow on behind the initial three developments.

For more information visit: www.arrowenergy.com.au


  Related Companies

>>>    Arrow Energy Limited
>>> BEACH PETROLEUM LIMITED

 

 
 
Arrow Energy (ASX:AOE) Upgrade Reserves and Production Estimates in the Surat Basin
 
Arrow Energy (ASX:AOE) Upgrade Reserves and Production Estimates in the Surat Basin
 
Arrow Energy Limited
2008.08.28  12:25
Beach Petroleum Limited (ASX:BPT)(PINK:BEPTF) Weekly Drilling Report Week ending 27 August 2008

2008.08.06  11:30
Beach Petroleum Limited (ASX:BPT) Announce Substantial Upgrade To Surat Basin Coal Seam Gas Reserves

2008.07.03  14:08
Beach Petroleum Limited (ASX:BPT) Weekly Drilling Report Week ending 2 July 2008

2008.01.16  11:23
Beach Petroleum (ASX:BPT) Gets Major Boost For Expanding Australian Coal Seam Gas Assets

2007.10.01  17:25
Aust Market Wrap, (ASX: PBL), (ASX: GRR), (ASX: AOE), (ASX: PHG), (ASX: BHP), (ASX: WES), (ASX: CGJ), (ASX: RIO)

 
BEACH PETROLEUM LIMITED
2008.11.12  17:07
Beach Petroleum Limited (ASX:BPT) Weekly Drilling Report 2008/11/12

2008.11.07  10:57
Beach Petroleum Limited (ASX:BPT) To Add Egyptian Oil Production To Global Asset Portfolio

2008.11.07  10:48
Beach Petroleum Limited (ASX:BPT) Egyptian Government Approves Gulf Of Suez Oil Concessions

2008.11.06  09:00
Beach Petroleum Limited (ASX:BPT) Weekly Drilling Report 2008/11/05

2008.11.03  10:45
Beach Petroleum Limited (ASX:BPT) Cooper Basin Gas - Gas Discovery Media Release

 
Asia Business News
Submit Press
News Alerts by Email
Home | Contact Us | About Us
Copyright 2008 Asia Business News Ltd.