Brisbane, July 3, 2008 (ABN Newswire) - Beach Petroleum Limited Weekly Drilling Report Week ending 2 July 2008
The weekly drilling report for the week ending 2 July 2008 is attached.
Highlights of the week's activities include:
Cooper/Eromanga Oil
- In areas operated by Santos, one successful well was drilled (Granchio-3, Beach 20.21%), and two wells are in progress (Big Lake-88, Beach 20.21% and Deparanie-2, Beach 20.21%).
----------------------------
Well Participants
----------------------------
Granchio-3 BPT 20.21%
PPL 188 STO* 66.60%
Oil Appraisal ORG 13.19%
C/E Basin, SA
Weekly Progress & Summary Primary Targets
Report Time: 0600 hrs (CST) 01/07/2008 McKinlay
Depth: 1571m Basal Birkhead (S)
Operation: Cased and suspended as future
McKinlay oil producer.
Progress: 257m
----------------------------
Well Participants
----------------------------
Big Lake-88 BPT 20.21%
PPL 11 STO* 66.60%
Oil Development ORG 13.19%
C/E Basin, SA
Weekly Progress & Summary Primary Targets
Report Time: 0600 hrs (CST) 01/07/2008 Hutton
Depth: 550m
Operation: Running surface casing
Progress: 550m
----------------------------
Well Participants
----------------------------
Deparanie-2 BPT 20.21%
PPL 174 STO* 66.60%
Oil Appraisal ORG 13.19%
C/E Basin, SA
Weekly Progress & Summary Primary Targets
Report Time: 0600 hrs (CST) 01/07/2008 Namur
Depth: 1439m Tirrawarra (s)
Operation: Drilling ahead in main hole.
Progress: 1439m
----------------------------
COAL SEAM GAS PROJECTS
----------------------------
Location Participants
PL 198 BPT 40%
Coal Seam Develop't AOE*60%
Surat Basin, QLD
Well Depth Operation: 0600hrs (EST) 2nd July 2008
Tipton - 113 392.35m Running production liner
Tipton -39T 133.93m Drilling ahead in main hole.
Tipton - 132A 622.00m (TD) Well completed, moved to Tipton 39T
Tipton - 133 631.00m (TD) Wellhead installed, moved to Tipton 113
* Operator
(s) Secondary Targets
BPT Beach Petroleum Ltd
STO Santos Limited
ORG Origin Energy Resources Ltd
AOE Arrow Energy NL