Sydney, Sep 9, 2008 (ABN Newswire) - Mosaic Oil (ASX:MOS)(PINK:MSAOF) Announce the weekly operations update for Taylor-19 and Freneau-1 in the Surat-Bowen Basin, Qld
Taylor-19 (PL 16 - MOS 100%)
Taylor-19 has been cased and cemented with 5-1/2" production casing string and suspended for future completion as a gas producer.
The well will be completed for production within 3 weeks using a workover rig moving into the Silver Springs area this week and is expected to be connected to the Taylor gathering network as early as the end of September 2008.
Freneau-1 (ATP 709P - MOS 100%)
The Century Rig 7 move to the Freneau-1 location, delayed by wet weather, will commence today. Freneau-1 is expected to be spudded on the weekend.
It is expected, on a trouble free basis, to take approximately 16 days to drill and evaluate the well, which has a planned total depth of 2400 metres.
Freneau-1 is a gas/condensate exploration well with the Tinowon Sandstone as the primary target and the Rewan Formation as the secondary target. The Freneau Prospect is located approximately 6 km east of Taylor-11.
The Freneau Prospect Tinowon Sandstone primary target has the potential to contain an estimated mean recoverable gas resource of 28.9 BCF in the Mean case, and up to 71.2 BCF in the P10 case.
Taylor-19 (PL 16 - MOS 100%)
Taylor-19 has been cased and cemented with 5-1/2" production casing string and suspended for future completion as a gas producer.
The well will be completed for production within 3 weeks using a workover rig moving into the Silver Springs area this week and is expected to be connected to the Taylor gathering network as early as the end of September 2008.
Freneau-1 (ATP 709P - MOS 100%)
The Century Rig 7 move to the Freneau-1 location, delayed by wet weather, will commence today. Freneau-1 is expected to be spudded on the weekend.
It is expected, on a trouble free basis, to take approximately 16 days to drill and evaluate the well, which has a planned total depth of 2400 metres.
Freneau-1 is a gas/condensate exploration well with the Tinowon Sandstone as the primary target and the Rewan Formation as the secondary target. The Freneau Prospect is located approximately 6 km east of Taylor-11.
The Freneau Prospect Tinowon Sandstone primary target has the potential to contain an estimated mean recoverable gas resource of 28.9 BCF in the Mean case, and up to 71.2 BCF in the P10 case.
| Tweet |
About Mosaic Oil Nl
Mosaic Oil N.L. (ASX: MOS) is a successful junior Australian explorer and producer of oil and gas. The Company's principal producing assets are based in the highly prospective proven producing Surat and Bowen basins of southeast Queensland. Mosaic's focus on Queensland now involves accelerated evaluation of the Company's extensive exploration and production acreage, ongoing development of new commercial petroleum plays and discoveries similar to the basin-centred hydrocarbon plays in the Canadian Deep Basin of Alberta and American Rocky Mountain area of Wyoming, and greater use of the Company's own extensive production infrastructure.
|
||
|
![]() |
Related Companies |
>>> |
![]() |
Related Industry Topics: |
Gas & Oil | Energy General | Financial General | |
![]() |
This Page Viewed: (Last 7 Days: 10) (Last 30 Days: 50) (Since Published: 9020) |
Site Search
| ENGLISH All Languages |
Upcoming WebCasts
| Mr Mark Paton CEO Cue Energy Resources Tuesday, June 12, 2012 |
| Mr Alan Hopkins CEO Pan Asia Corporation Tuesday, June 12, 2012 |
| Mr Barry Dawes Martin Place Securities Tuesday, June 12, 2012 |
| Dr Andrea Grant CEO Living Cell Technologies Monday, July 02, 2012 |
Companies in the News
Mobile Video TV
|
||
|
||








