![]() |
Adelaide, Sep 10, 2009 (ABN Newswire) - Beach Petroleum Limited (ASX:BPT)(PINK:BEPTF) drilling report for the week ending 9 September, highlights of the week's activities include:
Beach Petroleum Operated Cooper / Eromanga Exploration (PEL 218)
Wakefield-1 (Beach 23.33% in Post Permian JV), targeting oil in the Namur and Hutton Sandstones is expected to spud Thursday 10 September.
Beach Operated Bass Basin - Offshore Tasmania: Spikey Beach-1 (T/38P)
Spikey Beach-1 (Beach earning 80% in Spikey Beach Farmout Blocks) spudded on 5 September and is currently at a depth of 816 metres. Current operation is installing 13 3/8" casing.
Egypt - North Shadwan Concession - Gulf of Suez
The Comet drilling rig is being jacked up over the NS394-3 [Burtocal North] oil exploration well (Beach 20%) location. Drilling operations are expected to commence later today.
Beach Petroleum Operated Cooper / Eromanga Exploration (PEL 218)
Wakefield-1 (Beach 23.33% in Post Permian JV), targeting oil in the Namur and Hutton Sandstones is expected to spud Thursday 10 September.
Beach Operated Bass Basin - Offshore Tasmania: Spikey Beach-1 (T/38P)
Spikey Beach-1 (Beach earning 80% in Spikey Beach Farmout Blocks) spudded on 5 September and is currently at a depth of 816 metres. Current operation is installing 13 3/8" casing.
Egypt - North Shadwan Concession - Gulf of Suez
The Comet drilling rig is being jacked up over the NS394-3 [Burtocal North] oil exploration well (Beach 20%) location. Drilling operations are expected to commence later today.
---------------------------------
Well Participants
---------------------------------
Wakefield-1 BPT* 23.33%
PEL 91 ADE 10.00%
Oil Exploration ICN 33.33%
C/E Basin, SA DEK 16.66%
WEL 16.66%
-------------------------------------------------------
Weekly Progress & Summary Primary Targets
-------------------------------------------------------
Report Time: 0600 (CST)09/09/2009 Namur Sandstone
Depth: 0m Hutton Sandstone
Operation: Rigging up. Expect
to spud on 10 September.
Progress: 0m
---------------------------------
Well Participants
---------------------------------
Spikey Beach-1 BPT* 80.00%
T/38P CUE 10.00%
Oil Exploration EXO 10.00%
Bass Basin, Tas
-------------------------------------------------------
Weekly Progress & Summary Primary Targets
-------------------------------------------------------
Report Time: 0600 hrs (CST)09/09/2009 Upper Eastern View
Depth: 816m Group
Operation: Running 13 3/8" casing.
Progress: 816m
------------------------------------
Well Participants
------------------------------------
Paralana-2 BPT* 21.00%
GEL 178 PTR 69.00%
Geothermal Exploration TRU 10.00%
Arrowie Basin, SA
-------------------------------------------------------
Weekly Progress & Summary Primary Targets
-------------------------------------------------------
Report Time: 0600 hrs (CST)09/09/2009 Upper Cannana
Depth: 2253m or Bolla Bollana
Operation: Cementing 9 5/8" casing
Progress: 153m
----------------------------------
Well Participants
----------------------------------
NS-394-3 BPT 20.00%
(Burtocal-Nth) BP* 50.00%
Oil Exploration Well TOE 30.00%
N. Shadwan, Egypt
---------------------------------------------------------
Weekly Progress & Summary Primary Targets
---------------------------------------------------------
Report Time: 0600hrs (Egypt)08/09/2009 Nubia Sandstone
Depth: 0m Matulla Sandstone
Operation: Rigging up on location.
Progress: 0m
---------------------------------
Well Participants
---------------------------------
Charo-7 BPT 20.21%
PPL 177 STO* 66.60%
Oil Appraisal ORG 13.19%
C/E Basin, SA
-------------------------------------------------------
Weekly Progress & Summary Primary Targets
-------------------------------------------------------
Report Time: 0600 hrs (CST)09/09/2009 Birkhead Formation
Depth: 1880m (TD)
Operation: Conducting wiper trip prior
to running wireline logs.
Progress: 1880m
----------------------------------
Well Participants
----------------------------------
Okotoko West-2 BPT 23.20%
PL 288 (ATP 259P) STO* 60.06%
Gas Development ORG 16.74%
C/E Basin, QLD
-------------------------------------------------------
Weekly Progress & Summary Primary Targets
-------------------------------------------------------
Report Time: 0600 hrs (CST)09/09/2009 Hutton Sandstone
Depth: 2465m (TD) Patchawarra Fm (s)
Operation: Pulling out of hole to
run wireline logs.
Progress: 2055m
* Operator
(s) Secondary Targets
BPT Beach Petroleum Ltd
ICN Icon Energy Ltd
ADE Adelaide Energy Ltd
ORG Origin Energy Resources Ltd
BP BP Exploration (Delta)
PTR Petratherm Ltd
COE Cooper Energy
STO Santos Limited
CUE Cue Energy Resources
TOE TriOcean Energy
DEK Deka Resources Pty Ltd
TRU TRUenergy Pty Ltd
EXO Exoil Ltd
WEL Well Traced Pty Ltd
About Beach Energy Limited
Beach Energy Limited (ASX:BPT) is a long established oil and gas Exploration and Production Company, based in Adelaide, South Australia.
|
||
|
![]() |
Related Companies |
>>> >>> >>> >>> >>> >>> >>> >>> >>> |
![]() |
Related Industry Topics: |
Gas & Oil | Alternative Energy | Energy General | Financial General | Mining | |
![]() |
This Page Viewed: (Last 7 Days: 50) (Last 30 Days: 190) (Since Published: 58020) |
Site Search
| ENGLISH All Languages |
![]() |
Beach Energy Limited | ||||||
|
|||||||
![]() |
BP plc | ||||||
|
|||||||
AJAX UNION |
|||
|
|||
Companies in the News
ABN Newswire on iPhone/iPad
|
| Download from Apple |
Mobile Video TV
|
||
|
||







