Press Releases

Distributed: Oct 7, 2010

Alerts Login

Sydney, Oct 7, 2010 (ABN Newswire) - Bow Energy Limited (ASX:BOW) (PINK:BOWYF) are pleased to provide an update on exploration, appraisal and pilot production program in Bow's Bowen Basin CSG tenements. So far this year, Bow operations have been delayed over three months due to wet weather, which resulted in limited access, unsafe conditions and unscheduled delays in our reserves certification. Regardless, Bow's aggressive drilling and testing programs scheduled over the current quarter are targeting to deliver upon Bow's continued reserve upgrades from early next year.

Early results at Norwich Park (ATP1031P, Bow 100%) confirm at least one large gas field Bow has identified three high potential CSG prospects within this block, namely, Vermont, Dysart and Norwich and has now completed 6 core holes of a 9 well initial CSG exploration program.

Bow has obtained an initial certification of a 2C (contingent) gas resource of 1,402 petajoules (PJ) from the Vermont CSG Field which is one of three CSG projects in the Norwich Park Block.

The initial 2C resources are within the Fort Cooper and Moranbah Coal Measures. Bow is carrying out a permeability testing program during this quarter targeting conversion of the 2C resources into substantial 3P and initial 2P reserves in the Vermont CSG Field.

Gas contents, obtained to date in the Norwich Park Block, are high to very high ranging from 10-26 m3/tonne (Dry Ash Free) and are over 96% methane gas. A summary of six core wells drilled to date is set out below:

---------------------------------------
Well Total Gassy Coal Gas Content
Intersected (m3/tonne)
---------------------------------------
VM-1 52 metres 14-22
VM-2 77 metres 12-22
VM-3 62 metres 10-22
NW-1 66 metres 18-26
NW-2 53 metres Date pending
NW-3 38 metres Data pending
----------------------------------------

A second core hole exploration drilling rig is scheduled to commence this month to complete the Norwich Park initial exploration program by year end, weather permitting. Pilot production programs using another rig are scheduled early next year following similar programs scheduled in the Comet Block.

Comet Block (ATP 1025P - Bow 100%) appraisal program targets commercial gas flows

The Comet CSG Bowen Basin Block has a prospective area of 470 km2 comprising the Blackwater CSG and the Comet CSG Fields. Bow has to date obtained 3P gas reserves of 2,253PJ and 2P gas reserves of 59PJ over areas within the Comet Block. Adjacent tenements are operated by BG Group (LON:BG) and Arrow Energy Limited ( ASX:AOE) (50:50 owned by Shell (NYSE:RDS.A) and PetroChina (SHA :601857) (HKG:0857) (NYSE:PTR)).

To deliver commercial gas flow rates, Bow is in the process of trialing several completion techniques in the Blackwater CSG Field immediately west of the Blackwater Power station which is currently under construction and scheduled for commissioning early in 2011:

- Two 'four spot', vertical well, CSG pilots are scheduled to be fracture stimulated later this month. All eight wells have been drilled and cased and are awaiting fracture stimulation equipment. The fracture stimulations are designed to enhance the existing permeability and thereby improve fluid and gas flow rates. Fracture stimulation completions have resulted in commercial gas flow rates elsewhere in the Bowen Basin.

- Two lateral (horizontal) pilot wells drilling into an 8 metre Rangal coal seam target are also underway and planned for completion in November. Pre-lateral vertical exploration wells drilled into the target seam flowed gas to surface at low rates and a flow test of one of the vertical wells produced water at about 130 barrels per day suggesting good permeability. These initial lateral wells are located about 3 kilometres south of the northern 'four spot' CSG fracture pilot. Lateral drilling and completions have been successful in obtaining commercial gas flow rates in adjacent tenements and other CSG areas of the Bowen Basin.

For the complete Bow Energy Limited announcement including figures and tables, please refer to the following link:

http://www.abnnewswire.net/media/en/docs/63900-ASX-BOW-224698.pdf


About Bow Energy Limited

Bow Energy Limited (ASX:BOW) (PINK:BOWYF) is an S&P ASX 200 All Australian Index and S&P ASX 300 Index Company. The company's primary business is the discovery and commercial production of Coal Seam Gas (CSG) and conventional oil fields, with projects in several of Australia's producing basins.

The company is focused on expanding its CSG reserves, with eight CSG projects located within the highly prospective Bowen and Surat Basins of Queensland, and developing production for domestic and export natural gas customers.

The company has GIP potential across its CSG projects of over 13.8 Tcf and to date has certified net gas reserves of 2,360 petajoules (PJ) of 3P and 114 PJ of 2P. A record drilling program is underway for 2010, targeting year-end reserves of 4,128 PJ of 3P and 455 PJ of 2P.

Bow is currently developing the Blackwater Power Project, Bow's 100% owned 30 megawatt power station near Blackwater, central Queensland, which is scheduled for commissioning by the end of the first quarter 2011.

Contact

John De Stefani
CEO - Commercial
Bow Energy Limited
Tel: +61-7-3238-6300
http://www.bowenergy.com.au


  Related Companies

>>>         Arrow Energy
>>>         BG Group plc
>>>     Bow Energy Limited
>>>         PetroChina Company Limited
>>>         Royal Dutch Shell

  Related Industry Topics:

Gas & Oil | Energy General | Financial General | Mining | 

  This Page Viewed:  (Last 7 Days: 220) (Last 30 Days: 770) (Since Published: 23120) 

Events & Exhibitions

Site Search

 
 ENGLISH   All Languages

Upcoming WebCasts

Mr Mark Paton CEO
Cue Energy Resources
Tuesday, June 12, 2012

Mr Alan Hopkins CEO
Pan Asia Corporation
Tuesday, June 12, 2012

Mr Barry Dawes
Martin Place Securities
Tuesday, June 12, 2012

Dr Andrea Grant CEO
Living Cell Technologies
Monday, July 02, 2012


Arrow Energy
2011.04.27  09:56 D'Aguilar Gold Limited (ASX:DGR) Announce Institutional Participation In Armour Energy Limited Capital Raising
2011.03.14  17:54 D'Aguilar Gold Limited (ASX:DGR) Advise The Completion Of A$10 Million Seed Raising For Armour Energy
2010.10.13  13:00 Dart Energy Limited (ASX:DTE) Executive And Management Team In-Place To Deliver Growth
2010.10.11  09:55 D'Aguilar Gold Limited (ASX:DGR) Subsidiary Armour Energy To Focus On Northern Gas Province
2010.09.23  10:20 Brickworks Limited (ASX:BKW) Review of Results For The Year Ended 31 July 2010
BG Group plc
2012.01.24  09:55 Richard Cottee Joins Austin Exploration (ASX:AKK) Board As Non Executive Chairman
2011.02.28  09:54 Dart Energy Limited (ASX:DTE) Announce Early Acquisition Of Composite Energy Limited
2010.07.05  09:26 WestSide Corporation Limited (ASX:WCL) Emerges As New Force In Coal Seam Gas With Finalisation Of Dawson Acquisition
2010.04.01  13:30 Asian Markets Overview of April 1: Tokyo Gas (TYO:9531) to Join BG Group's (LON:BG) LNG Project in Australia
2010.03.24  13:30 Asian Markets Overview of March 24, 2010: BG (LON:BG) and CNOOC to Sign LNG Deal Up to A$80 Billion
Bow Energy Limited
2011.07.01  12:05 Asian Activities Report for July 1, 2011: Cougar Energy (ASX:CXY) Announce Project Progress in China and Mongolia
2011.04.27  09:56 D'Aguilar Gold Limited (ASX:DGR) Announce Institutional Participation In Armour Energy Limited Capital Raising
2011.03.14  17:54 D'Aguilar Gold Limited (ASX:DGR) Advise The Completion Of A$10 Million Seed Raising For Armour Energy
2011.03.11  10:11 Bow Energy Limited (ASX:BOW) Cuisinier 3 Appraisal Well To Be Cased For Production Testing
2011.01.06  12:27 Bow Energy Limited (ASX:BOW) Updates On Operational Impact From The Queensland Floods
Webcast Your Annual General Meeting

Mobile Video TV

qrcode
Scan with your Mobile Phone to view ABN Newswire Video Channel on Mobile
 
City Index - A Better Way To Trade