Press Releases

Distributed: Nov 2, 2011

Alerts Login

Adelaide, Nov 2, 2011 (ABN Newswire) - Beach Energy Limited (ASX:BPT) (PINK:BEPTF) provides the following monthly drilling report for October 2011.

Beach Operated Cooper - Eromanga Oil - Western Flank

Two further appraisal wells have been drilled on the Bauer Oilfield discovery (PEL-91, Beach 40%) in the Western Flank, following the success last month of the Bauer-4 well.

The Bauer-2 and Bauer-3 wells were drilled 380 metres to the west and 300 metres south-east, respectively, from Bauer-1. The wells delineated the western and southern structural extents of the field. Both wells were cased and suspended for future oil production, after Bauer-2 intersected a 6.5 metre gross oil column (with 3 metres of highly permeable Namur Sandstone oil pay) and Bauer-3 found 10 metres of oil (with 3.5 metres of Namur oil pay).

The Ensign#30 rig has subsequently spudded the Basham-1 exploration well (also in PEL-91) targeting a seismically-defined Birkhead channel play. The well has reached a total depth of 1,979 metres and is preparing to conduct wireline logging.

Beach Operated Geothermal - Paralana Project, Arrowie Basin

The Paralana-2 (Beach 21%) geothermal well was flow tested during early October, producing fluid at rates ranging between 1 and 6 litres/sec (543 to 3260 barrels/day). After six days, the flowing bottom hole temperature was 171 degree Celsius. Brine samples were collected for geochemical analysis. Final conclusions will take several weeks to compile.

Senex (ASX:SXY) Operated Cooper-Eromanga Oil - Western Flank

An eleven-well exploration and development drilling program has commenced. At the end of the month, the first well in this campaign, Growler-6 (PRL-15, Beach 40%), was running in the hole to drill ahead to TD after cutting three cores across the Birkhead Formation reservoir.

Santos (ASX:STO) Operated Cooper Basin Oil and Gas Development

Two gas development wells (Moomba-188 and Moomba-190) were drilled in the SA sector of the Cooper Basin (Beach 20.21%), both of which were cased and suspended as future Toolachee Formation and Daralingie Formation gas producers. A gas development well, Coonaberry-3 (Beach 23.2%), was spudded in Queensland (PL 187) and is currently running surface casing.

Also in Queensland, two oil wells were drilled on the Munro Oilfield (Beach 40%), resulting in both Munro-6 and -7 being cased and suspended as future oil producers from the Hutton Sandstone.

INTERNATIONAL

Kuwait Energy Operated - Abu Sennan Concession, Egypt

El Salmiya-1 (Beach 22%) spudded on 14 October 2011 and is the third exploration well in a planned six-well program on the Abu Sennan permit. The El Salmiya location is approximately 10 km east of the Al Ahmadi-1 and ZZ-4 successes. At the time of this report, the well was drilling ahead at 2393 metres measured depth.

A second rig is preparing to spud at the Al Jahraa-1 location, the fourth exploration well of the Abu Sennan campaign. This well is located about 20 km west of Al Ahmadi-1 and ZZ-4 wells.


For the complete Beach Energy announcement including tables, please refer to the following link:
http://media.abnnewswire.net/media/en/docs/ASX-BPT-185422.pdf


About Beach Energy Limited

Beach Energy Limited (ASX:BPT) is a long established oil and gas Exploration and Production Company, based in Adelaide, South Australia.

Contact

Corporate
Reg Nelson
Beach Energy Limited
Tel: +61-8-8338-2833

Neil Gibbins
Beach Energy Limited
Tel: +61-8-8338-2833

Investor Relations
Chris Jamieson
Beach Energy Limited
Tel: +61-8-8338-2833

Email: info@beachenergy.com.au
http://www.beachenergy.com.au


  Related Companies

>>>              Beach Energy Limited
>>>          Santos Limited
>>>              Senex Energy Limited

  Related Industry Topics:

Gas & Oil | Energy General | Financial General | 

  This Page Viewed:  (Last 7 Days: 310) (Last 30 Days: 1090) (Since Published: 11970) 

Events & Exhibitions

Site Search

 
 ENGLISH   All Languages

Upcoming WebCasts

Mr Mark Paton CEO
Cue Energy Resources
Tuesday, June 12, 2012

Mr Alan Hopkins CEO
Pan Asia Corporation
Tuesday, June 12, 2012

Mr Barry Dawes
Martin Place Securities
Tuesday, June 12, 2012

Dr Andrea Grant CEO
Living Cell Technologies
Monday, July 02, 2012


Beach Energy Limited
2012.05.25  13:47 Beach Energy Limited (ASX:BPT) Progressing Tie-In of New Oil Trunkline to Moomba
2012.05.21  15:51 Beach Energy Limited (ASX:BPT) To Accept Cooper Energy (ASX:COE) Off-Market Takeover Offer For Somerton Energy (ASX:SNE)
2012.05.15  16:53 Beach Energy Limited (ASX:BPT) Clarification of Dow Jones Article
2012.05.02  15:33 Beach Energy Limited (ASX:BPT) Monthly Drilling Report - April 2012
2012.04.30  10:09 Beach Energy Limited (ASX:BPT) Quarterly Activities Report to 31 March 2012
Santos Limited
2012.05.25  13:47 Beach Energy Limited (ASX:BPT) Progressing Tie-In of New Oil Trunkline to Moomba
2012.01.24  09:55 Richard Cottee Joins Austin Exploration (ASX:AKK) Board As Non Executive Chairman
2012.01.09  10:32 Beach Energy Limited (ASX:BPT) Commences Production from Middleton Gas Project
2012.01.04  16:12 Beach Energy Limited (ASX:BPT) Monthly Drilling Report - December 2011
2011.11.22  10:07 Beach Energy Limited (ASX:BPT): Tantanna Pipeline Back Online
Senex Energy Limited
2012.05.25  13:47 Beach Energy Limited (ASX:BPT) Progressing Tie-In of New Oil Trunkline to Moomba
2012.04.05  08:36 Beach Energy Limited (ASX:BPT) Growler Field reserves upgrade by Operator
2012.01.04  16:12 Beach Energy Limited (ASX:BPT) Monthly Drilling Report - December 2011
2011.11.22  10:07 Beach Energy Limited (ASX:BPT): Tantanna Pipeline Back Online
2011.08.24  12:00 Asian Activities Report for August 24, 2011: TVN Corporation (ASX:TVN) Drilling Update at the Nuurst Coal Project in Mongolia
Webcast Your Annual General Meeting

Mobile Video TV

qrcode
Scan with your Mobile Phone to view ABN Newswire Video Channel on Mobile
 
City Index - A Better Way To Trade