Press Releases

Distributed: Jan 30, 2012

Alerts Login

Perth, Jan 30, 2012 (ABN Newswire) - Central Petroleum Limited (ASX:CTP) is pleased to advise that independent consultants RPS Energy Pty Ltd ("RPS") concluded that the pressure transient data gathered during the production test of Surprise-1REH indicates that the well may access STOIIP ("Stock Tank Oil Initially In Place") in the range of 0.5 to 2 million barrels in an area proximal to the well. No apparent boundaries were identified during the analysis of the pressure transient data. However, Central acknowledges that no further conclusions regarding the possible range of STOIIP volumes in the entire Surprise structure of c.8 km2 can be made until all available seismic, geological and geophysical data has been integrated and analysed.

RPS based their calculations on a 105m section of the horizontal well bore placed in the lower half of an 8m thick sandstone reservoir section with an average permeability of 50 milliDarcies and a vertical to horizontal permeability ratio of 10%.

From the estimated reservoir pressure and the quasi-stable flowing BHP/rate, a Productivity Index (PI) of 0.65 bopd/psi can be calculated. Even though this is a transient PI and will decrease until reaching pseudo-steady state ("PSS"), the Inflow Performance Relationship ("IPR") curve suggests significant production increase potential upon greater draw-downs via artificial lift and possibly pressure maintenance in the medium to long term.

Initial flow testing of the Surprise-1REH well produced a final stable flow rate of c.400 BOPD of sweet light crude with an API Gravity averaging 400.

The Company is actively planning, (subject to various approval processes, weather and access), an Extended Production Test ("EPT") of the Surprise-1REH well coupled with a sales contract for any oil produced. This is anticipated to commence in April 2012.

A second horizontal well prior to a 3D seismic survey of the Surprise structure and associated prospects and leads is under consideration. This is subject to further analysis of all data available which may result in a decision to postpone further drilling until a 3D survey can be conducted and the results of the EPT of Surpirse-1REH are available. If a second well is drilled, it too is planned to be placed on an Extended Production Test with an associated sales contract for oil produced.


About Central Petroleum Limited

Central Petroleum (ASX:CTP) is an ASX listed junior exploration and production company operating what is regarded as the biggest package of prospective acreage in Australia.

Contact

John Heugh
Managing Director
Central Petroleum Limited
T: +618-9474-1444
F: +618-9474-1555
http://www.centralpetroleum.com.au


  Related Companies

>>>       Central Petroleum Limited

  Related Industry Topics:

Gas & Oil | Energy General | Financial General | 

  This Page Viewed:  (Last 7 Days: 40) (Last 30 Days: 290) (Since Published: 4440) 

Events & Exhibitions

Site Search

 
 ENGLISH   All Languages

Upcoming WebCasts

Mr Mark Paton CEO
Cue Energy Resources
Tuesday, June 12, 2012

Mr Alan Hopkins CEO
Pan Asia Corporation
Tuesday, June 12, 2012

Mr Barry Dawes
Martin Place Securities
Tuesday, June 12, 2012

Dr Andrea Grant CEO
Living Cell Technologies
Monday, July 02, 2012


Webcast Your Annual General Meeting

Mobile Video TV

qrcode
Scan with your Mobile Phone to view ABN Newswire Video Channel on Mobile
 
City Index - A Better Way To Trade