PRIMERO WEST-1 SPUDDED
PRIMERO WEST-1 SPUDDED
Brisbane, Nov 12, 2018 AEST (ABN Newswire) - State Gas Limited (ASX:GAS) is pleased to advise that, the Primero West-1 well at the Reid's Dome Gas Project was spudded on Saturday, 10 November at 11:30AM AEST.

Sliver City Drilling has supplied Rig-25 for the drilling program and the co-ordinates for the Primero West-1 are:

Latitude: 24o 47' 12.860" S

Longitude: 148o 18' 42.718" E

State Gas Limited is Operator and 60%-owner of the Reid's Dome Gas Project.


About State Gas Limited

State Gas Limited ASX:GASState Gas Limited (ASX:GAS) is a Queensland-based developer of the Reid's Dome gas field (PL 231), which includes both CSG and conventional gas, originally discovered in 1954 during oil drilling prior to the existence of a pipeline network and an east coast gas market. The Reid's Dome field is located in the Bowen Basin in Central Queensland on the apex of the Springsure-Sericold Anticline. State Gas is sole Operator and 80%-owner (transitioning to 100%) of PL 231, which is well-located 30 kilometres southwest of Rolleston, approximately 47 kilometres from the Queensland Gas Pipeline.

http://www.stategas.com

 


Contact

Lucy Snelling
Chief Executive Officer
M: +61-439-608-241
E: lucy@stategas.com

Greg Baynton
Executive Director
M: +61-414-970-566
E: greg@stategas.com



Related Companies

State Gas Limited

ABN Newswire This Page Viewed:  (Last 7 Days: 41) (Last 30 Days: 141) (Since Published: 2196) 
ANALYTICS: LOGIN HERE

State Gas Limited NEWS: RECENT VISITS (7465)