Central Petroleum Limited (
The 9 5/8" casing was run and cemented requiring an additional cement plug at the shoe to ensure integrity. Following a successful Formation Integrity Test (FIT) drilling recommenced in the 8 1/2" hole utilizing a conventional mud system. Total lost circulation occurred at 2,024m, an LCM pill was spotted and the under-balanced air drilling package rigged up in preparation for drilling ahead. Underbalanced drilling then commenced to the current depth of 2,058m The PV12 well has two alternate objectives. The primary deep gas exploration target is the Arumbera Sandstone at an anticipated depth of 3,560m. Alternatively, if the deep exploration target is not successful, a shallower gas appraisal lateral will be drilled in the currently producing P1 formation with the potential to become a production well.
The PV12 well is the first of a 2-well drilling program that also includes the Dingo-5 exploration / production well. Both wells are being drilled under joint ventures between Central (50% interest), New Zealand Oil & Gas Limited (
About Central Petroleum Limited
Central Petroleum Limited (Central) is a well-established, and emerging ASX-listed Australian oil and gas producer (ASX:CTP). In our short history, Central has grown to become the largest onshore gas producer in the Northern Territory (NT), supplying industrial customers and senior gas distributors in NT and the wider Australian east coast market.
Central is positioned to become a significant domestic energy supplier, with exploration and development plans across 180,000 km2 of tenements in Queensland and the Northern Territory, including some of Australia's largest known onshore conventional gas prospects. Central has also completed an MoU with Australian Gas Infrastructure Group (AGIG) to progress the proposed Amadeus to Moomba Gas Pipeline to a Final Investment Decision.
We are also seeking to develop the Range gas project, a new gas field located among proven CSG fields in the Surat Basin, Queensland with 135 PJ (net to Central) of development-pending 2C contingent resource.
Contact
Investor and Media Inquiries:Greg Bourke: +61-478-318-702
Sarah Morgan: +61-421-664-969
Related Companies
Related Industry Topics: