Central Petroleum Limited (ASX:CTP) ("Company" or "Central"), as Operator and 100% owner of Palm Valley Gas Field, announces that the Palm Valley 13 ("PV13") well spudded today at 4pm AEST.

Ensign Australia Pty Ltd is drilling the well using its Ensign 932 Drilling Rig.

The well aims to access the known gas in the Pacoota P1 sandstone, by intersecting the P1 target at a high angle to increase the chances of connecting to naturally occurring fractures.

The PV13 program anticipates a 46 day drilling timeline to reach a total depth of 3,476 metres MD (measure depth) with a vertical depth of 2,102 metres TVD (true vertical depth) and a near horizontal (84.9 Degrees) reservoir section of up to 1,040 metres MD.


About Central Petroleum Limited

Central Petroleum Limited (ASX:CTP) is an oil and gas explorer and producer listed on the Australian Securities Exchange focused on supplying the domestic gas market. Central is advancing several separate projects across what is regarded as the biggest package of proven and prospective oil and gas acreage across central Australia. This spread of assets gives Central multiple options for growth and development. 88% of this land being gas prone has led to the Company's focus on becoming a major domestic gas producer.

 

Contact

Central Petroleum Limited
T: +61-7-3181-3800
F: +61-7-3181-3855
E: info@centralpetroleum.com.au
WWW: www.centralpetroleum.com.au

Media Enquiries
Martin Debelle at Citadel-MAGNUS
T: +61-2-8234-0100
M: +61-409-911-189



Link: PALM VALLEY 13 SPUDS



Related Companies

Central Petroleum Limited
     


Related Industry Topics:
Gas & Oil Energy General Financial General