Quarterly Activities Report
Quarterly Activities Report

Brisbane, April 30, 2020 AEST (ABN Newswire) - State Gas Limited (googlechartASX:GAS) is owner and operator of the Reid's Dome Gas Project (PL 231) in central eastern Queensland, approximately 545 km northwest of Brisbane and 50 km southwest of Rolleston, in the Bowen Basin Central Queensland. The permit hosts both conventional and unconventional gas and is approximately 45 km from the high pressure gas pipeline network in Queensland.

In August 2018 Pipeline Survey Licence 2028 was issued to the Company, enabling investigations to commence for a pipeline route to market. In late 2018 State Gas drilled the first coal seam gas well in the region into the Reid's Dome Beds and established the potential for a significant coal seam gas project in PL 231. Permian coal measures within the Reid's Dome Beds are extensive across the entire permit but the area had not been explored for coal seam gas prior to the drilling program undertaken by State Gas.

State Gas has adopted a strategy to bring gas to market from PL 231 to meet near term forecast shortfalls in the east coast domestic gas market. The strategy involves progressing a phased appraisal program in parallel with permitting for an export pipeline and development facilities to facilitate the fastest possible delivery of gas to market.

The rationale for the strategy was supported by the Australian Energy Market Operator's Gas Statement of Opportunities 2020, released in late March, which warns that the southern states of Australia could face gas shortfalls by 2024 and as early as 2023. While this report pre-dates the current COVID-19 crisis your Board believes it remains essentially valid: while COVID-19 may depress gas demand, the oil price crash may well lead to equal or greater reductions in domestic supply. The development of the Queensland LNG projects has caused the linkage of the east coast domestic gas and international LNG markets, particularly in Asia, with surplus Queensland produced gas moving between each. Asian LNG demand has been severely impacted by COVID-19, but is showing signs of recovery, particularly in China. At the same time we have seen several major new LNG projects cancelled or deferred, and it can be anticipated that US LNG supply will also reduce, as gas is no longer so freely produced as a by-product of oil shale. If these reductions in supply outweigh the recovered demand we can anticipate Australian gas moving to meet the international market, and a commensurate reduction of gas available to meet Australian shortfalls.

The drilling of the Aldinga East-1A and Serocold-1 wells during the December 19 Quarter confirmed the extension in the northern and central areas of the permit of the Reid's Dome coal measures previously identified in the south by Nyanda-4. The objective of the March Quarter was to confirm producibility of the gas through production testing of the Nyanda-4 and Serocold-1 wells.

PROJECT ACTIVITIES

The March 2020 Quarter commenced extremely well, with production of gas from Nyanda-4 commencing on 9 December 2019, after just 5 days of dewatering. The gas rate and increased consistently as the water level (and hence downhole pressure) was lowered. A gas rate of 227 mscf/d was recorded on 23 January 2020. However, at that point the pump shut down with technical problems. Frustratingly, widespread heavy rain and floods in late January to March washed out site roads and prevented access to enable remediation of the pump. Gas continued to flow from the well at reducing rates as down hole pressures gradually increased with the recharging water. The slow water recharge is consistent with the low water make during pumping from the well, suggesting water management costs (a large component of CSG operating costs) will be at the lower end of the range for coal seam gas projects.

Production testing commenced at Serocold-1 in the central area of the permit on 17 January 2020 and early signs of gas production were also seen within a week. However as with Nyanda-4, pump problems and wet weather intervened and dewatering was shut down.

Access to site was re-established in April 2020 and works to recommence dewatering undertaken after Easter. While pumping issues are currently being addressed the high gas flow rates and low water discharge proved in this campaign augur well for future production.

At Aldinga East-1A the Company has also observed a build up in wellhead pressure commensurate with the reservoir pressure measured during logging operations, suggesting that access to the conventional gas discovered in the Cattle Creek Formation has been re-established. The Company continues to monitor this pressure and has commenced planning for a short-term flow rate test of Aldinga East-1A.

Export Pipeline

While field activities were restricted during the wet season, State Gas has also progressed plans for an export pipeline from the Reid's Dome gas field. A desktop study of potential options has been undertaken and has confirmed a viable route from the gas field to the high pressure east coast gas pipeline network, via the Queensland Gas Pipeline (approximately 45km to the east of the field).

Financial Position

As noted above, your Board believes the mid-term outlook for gas from Reid's Dome remains strong, and accordingly we continue to move the Company towards achieving gas to market as soon as possible, while at the same time focussing tightly on near term activities most likely to build reserves and hence company value. Board and management remuneration has been restructured, and reductions from suppliers negotiated where possible.

Options for future development funding are being considered, including strategic partnering and pre-sales, along with and debt and equity.
At the end of the Quarter the Company had cash at bank of $1.54m, after expending $2.26m in Project development costs, and $0.14m in other costs. The Company is in a good position not only to weather the COVID-19 storm, but also to advance our commercial aims.

To view tables and figures, please visit:
https://abnnewswire.net/lnk/6G7LR41R


About State Gas Limited

State Gas Limited ASX:GASState Gas Limited (ASX:GAS) is a Queensland-based developer of the Reid's Dome gas field, originally discovered during drilling in 1955, located in the Bowen Basin in Central Queensland. State Gas is 100%-owner of the Reid's Dome Gas Project (PL-231) a CSG and conventional gas play, which is well-located 30 kilometres southwest of Rolleston, approximately 50 kilometres from the Queensland Gas Pipeline and interconnected east coast gas network.

Permian coal measures within the Reid's Dome Beds are extensive across the entire permit but the area had not been explored for coal seam gas prior to State Gas' ownership. In late 2018 State Gas drilled the first coal seam gas well in the region (Nyanda-4) into the Reid's Dome Beds and established the potential for a significant coal seam gas project in PL 231. The extension of the coal measures into the northern and central areas of the permit was confirmed in late 2019 by the Company's drilling of Aldinga East-1A (12 km north) and Serocold-1 (6 km to the north of Nyanda-4).

State Gas is also the 100% holder Authority to Prospect 2062 ("Rolleston-West"), a 1,414 km2 permit (eight times larger than PL 231) that is contiguous with the Reid's Dome Gas Project. Rolleston-West contains highly prospective targets for both coal seam gas (CSG) and known conventional gas within the permit area. It is not restricted by domestic gas reservation requirements.

The contiguous areas (Reid's Dome and Rolleston-West), under sole ownership by State Gas, enable integration of activities and a unified super-gasfield development, providing economies of scale, efficient operations, and optionality in marketing.

State Gas is implementing its strategic plan to bring gas to market from Reid's Dome and Rolleston-West to meet near term forecast shortfalls in the east coast domestic gas market. The strategy involves progressing a phased appraisal program in parallel with permitting for an export pipeline and development facilities to facilitate the fastest possible delivery of gas to market. State Gas' current focus has been to confirm the producibility of the gas through production testing of the wells.

 

abnnewswire.com 


Contact

Lucy Snelling
Chief Executive Officer
Phone: 0439 608 241
e-mail: lucy@stategas.com

Richard Cottee
Executive Chairman
Phone: 0458 517 850
e-mail: richard@stategas.com



ABN Newswire
ABN Newswire This Page Viewed:  (Last 7 Days: 8) (Last 30 Days: 31) (Since Published: 3877)