Perth, June 20, 2008 AEST (ABN Newswire) - Kasbah Resources (ASX:KAS) Annnounce an update to the Phase 1 Results of the Achmmach Exploration. The Phase 1 drill program at the Eastern area of the Achmmach Tin Project has now been completed.

A total of 17 diamond core holes (AD001 to AD017) totalling 4192 metres were drilled with the twin objectives of:

a. investigating the previous drilling undertaken by the Bureau de Recherches et des Participations Minières (BRPM), and

b. testing the potential for shallow zones of tin mineralisation in the Eastern area.

Highlights:

- Phase 1 diamond drilling program in the Eastern area of the Achmmach Tin Project completed

- Phase 1 tested 650 metres of a 2 kilometre long mineralised system

- Drilling has discovered new shallow tin zones in the Eastern area

- New high grade down hole tin intercepts achieved include;
-------------------------------------------- AD015:        1.9m @ 3.1% Sn from 163.6m;                 5.2m @ 2.0% Sn from 382.9m;                 3.8m @ 1.1% Sn from 392.8m- AD016:        1.9m @ 1.2% Sn from 121.7m;                 1.0m @ 10.5% Sn from 129.8m     (Including 0.3m @ 31.6% Sn from 130.2m)                5.2m @ 1.0% Sn from 132.5m- AD017:        2.0m @ 1.2% Sn from 113.5m -------------------------------------------
- Phase 2 drilling has commenced with the aim of the program being to expand the proven mineralisation beyond the existing underground workings in the Western area of the Achmmach tin project

For the full report, please view the detailed announcement at:
ACHMMACH EXPLORATION UPDATE - Phase 1 Results
http://kasbahresources.com/cms/

Contact

Wayne Bramwell
Managing Director
Phone: +61 8 9463 6651

Peter Youd
Chief Financial Officer
Phone: +61 8 9463 6651
info@kasbahresources.com


ABN Newswire
ABN Newswire This Page Viewed:  (Last 7 Days: 2) (Last 30 Days: 22) (Since Published: 2034)