Beach Energy Limited Stock Market Press Releases and Company Profile

Adelaide, Oct 29, 2008 AEST (ABN Newswire) - Beach Petroleum Limited (ASX:BPT)(PINK:BEPTF) announce the drilling report for the week ending ending 29 October 2008

The drilling report and well location map for the week ending 29 October, 2008 are attached. Highlights of the week's activities include:

Cooper/Eromanga Oil

In areas operated by Santos, two wells are in progress (Tickalara-20, Beach 30.00% and Jackson South-16, Beach 38.50%).

Beach Petroleum Operated Cooper / Eromanga Exploration

Brownlow-1 (PEL 106FI, Beach 50.00%) is drilling ahead at a depth of 2520 metres in the Patchawarra Formation.

Bass Basin - Offshore Tasmania: PeeJay-1 (T/39P)

Rig repairs are in progress. The rig owner has advised that drilling at PeeJay-1 is expected to resume in mid November
----------------------------Well            Participants----------------------------    PeeJay-1        BPT*    50.00%  T/39P           BEN     50.00%  Oil Exploration                 Bass Basin, Tas.                ---------------------------------------------------------------Weekly Progress & Summary                       Primary Targets---------------------------------------------------------------Report Time:    0600 (AEST) 29/10/2008          Upper Eastern Depth:          0m                              View GroupOperation:      Rig repairs.                                    Progress:       0m              ----------------------------Well            Participants----------------------------Brownlow-1      BPT*    50.00%PEL106 (Farmin block)  DLS     50.00%  Gas Exploration                 C/E Basin, SA---------------------------------------------------------------Weekly Progress & Summary                       Primary Targets---------------------------------------------------------------Report Time:    0600 (CST) 29/10/2008           Patchawarra FmDepth:          2520m                   Operation:      Drilling ahead in Patchawarra Fm.Progress:       1596m                   ----------------------------Well            Participants----------------------------Yawa-2          BPT     23.20%  PL 111          STO*    60.06%  Gas Development ORG     16.74%   C/E Basin, QLD                  ---------------------------------------------------------------Weekly Progress & Summary                       Primary Targets---------------------------------------------------------------Report Time:    0600 hrs (CST) 29/10/2008       Patchawarra FmDepth:          2625m (TD)                      Operation:      Wiper trip in advance of running logs .  Progress:       1861m                   ----------------------------Well            Participants----------------------------Big Lake-91     BPT     20.21%  PPL11           STO*    66.60%  Gas Development ORG     13.19%  C/E Basin, SA                  ---------------------------------------------------------------Weekly Progress & Summary                       Primary Targets---------------------------------------------------------------Report Time:    0600 hrs (CST) 29/10/2008       Patchawarra FmDepth:          2451m (2349m TVD)               Tirrawarra Sst (s)Operation:      Drilling ahead in Daralingie Fm.   Progress:       1232m                   ----------------------------Well            Participants----------------------------Tickalara-20    BPT     30.00%  PL 34           STO*    70.00%  Oil Appraisal     C/E Basin, Qld ---------------------------------------------------------------Weekly Progress & Summary                       Primary Targets---------------------------------------------------------------Report Time:    0600 hrs (CST) 29/10/2008       McKinlay MemDepth:          1422m                           Other Jurassic(S)Operation:      Pulling out of hole to casing                 shoe to investigate                                     problem with top drive.                 Progress:       837m                    ----------------------------Well            Participants----------------------------Jackson South-16BPT     38.50%  PL 24           STO*    55.50%  Oil Development IOR     2.00%   C/E Basin, Qld  DLS     2.00%                   AGF     2.00%      ---------------------------------------------------------------Weekly Progress & Summary                       Primary Targets---------------------------------------------------------------Report Time:    0600 hrs (CST) 29/10/2008       Westboure FmDepth:          1296m                           mid Birkhead Fm /Operation:      Drilling ahead in Namur Sst.    Hutton SstProgress:       894m                    --------------------------------COAL SEAM GAS PROJECTS          Location            Participants--------------------------------Pl 198               BPT        40%             Coal Seam Develop't  AOE*       60%             Surat  Basin, QLD                               --------------------------------------------------------------------Well         Depth       Operation: 0600hrs (EST) 29th October 2008 --------------------------------------------------------------------Tipton-138   523.0m (TD)     logging hole                                    * Operator                                   (s)  Secondary Targets    AOE  Arrow Energy NL              BEN  Benaris Petroleum N.V  BPT  Beach Petroleum Ltd  ORG  Origin Energy Resources LTD  DLS  Drillsearch Energy     STO  Santos Limited       AGF  Australian Gas Fields LTD   IOR Inland Oil Resources

Contact

Reg Nelson
Beach Petroleum
08 8338 2833

Mark Lindh
Adelaide Equity
0414 551 361

Ian Howarth
Farrington National
03 9223 2455


ABN Newswire
ABN Newswire This Page Viewed:  (Last 7 Days: 7) (Last 30 Days: 18) (Since Published: 1280)