Beach Energy Limited Stock Market Press Releases and Company Profile

Perth, Mar 19, 2009 AEST (ABN Newswire) - Beach Petroleum Limited (ASX:BPT)(PINK:BEPTF) The drilling report for the week ending 18 March, 2009 is attached. Highlights of the week's activities include:

Egypt - South East July Concession - Gulf of Suez

South July-1 reached a total depth of 3927 metres in Rudeis, Yusr Member sandstones. Due to a thicker than anticipated Lower Rudeis interval, the well was not deepened further in an attempt to reach the Nubia Formation, the second of its two primary reservoir targets. Hydrocarbon shows were encountered at the top of the Yusr Member and the well is now being sidetracked in order to evaluate the Yusr sands in a position up-dip of the current location. South July-1 ST1 is currently drilling ahead at a depth of 2857 metres. Interests in the sidetrack are Beach Petroleum (Egypt) Pty Limited, 33.33% and Dana Petroleum (E&P) Limited, 66.67%. Concession Operator Santos Egypt Pty Ltd. has elected to not participate in the sidetrack.
------------------------------------Well                    Participants------------------------------------South July-1ST1         BPT    3.33%SE July Concession      DNX*  66.67%Oil ExplorationGulf of Suez,  Egypt---------------------------------------------------------------Weekly Progress & Summary                       Primary Targets---------------------------------------------------------------Report Time:    0600hrs (Egypt) 18/03/2009      Lower Rudeis FmDepth:          2857mOperation:      Well being sidetracked after reaching depth of 3927                metres.  Currently drilling ahead  in sidetrack hole to                evaluate lower Rudeis Formation sands in updip positionProgress:       83m------------------------------------Well                    Participants------------------------------------Fly Lake-26             BPT    0.21%PPL18                   STO*  66.60%Gas Development         ORG   13.19%C/E Basin, SA---------------------------------------------------------------Weekly Progress & Summary                       Primary Targets---------------------------------------------------------------Report Time:    0600 hrs (CST) 18/03/2009       Patchawarra FmDepth:          2952m (TD)Operation:      Well is cased and suspended as a future Patchawarra                Formation and Tirrawarra Sandstone gas producerProgress:       0m------------------------------------Well                    Participants------------------------------------Nephrite Sth-5          BPT   20.21%PPL 140                 STO*  66.60%Gas Devlpment           ORG   13.19%C/E Basin, SA---------------------------------------------------------------Weekly Progress & Summary                       Primary Targets---------------------------------------------------------------Report Time:    0600 hrs (AEST) 18/03/2009      Patchawarra FmDepth:          1778mOperation:      Drilling ahead in the Murta FormationProgress:       1520m---------------------------------------------------------------* Operator(s)   Secondary TargetsORG   Origin Energy Resources LTDBPT   Beach Petroleum LtdSTO   Santos LimitedDNX   Dana Petroleum (E&P) Limited

Contact

Hector Gordon
Chief Operating Officer
TEL: +61-8-8338-2833



ABN Newswire
ABN Newswire This Page Viewed:  (Last 7 Days: 2) (Last 30 Days: 11) (Since Published: 1729)