Atlas Iron Limited Stock Market Press Releases and Company Profile

View in Other Languages Atlas Iron Limited (ASX:AGO) 宣布Wodgina DSO 项目资源量提高527% Atlas Iron Limited (ASX:AGO) Announce A 527% Increase In Resources At Wodgina DSO Project Atlas Iron Limited (ASX:AGO)宣布Wodgina DSO項目資源量提高527% 
Atlas Iron Limited (ASX:AGO)
Atlas Iron Limited (ASX:AGO)

Perth, May 19, 2009 AEST (ABN Newswire) - Atlas Iron Limited (ASX:AGO) is pleased to announce a 527% increase in the DSO resource at its Wodgina DSO Project from 8.1Mt at 57.5% Fe (see announcement of 15 January 2009) to 42.7Mt at 56.3% Fe.

The Wodgina DSO Project (Atlas 100% Fe Rights) is located 100km south of Port Hedland in the Pilbara of Western Australia.

"This is a 5-fold increase in the DSO resource since January 2009, and a direct result of our aggressive drilling campaign at Wodgina in the past 6 months", commented David Flanagan, Atlas' Managing Director. "As yet we've only drilled half the targets in the area, which suggests Wodgina is likely to get even larger. We are now fast tracking feasibility studies to underpin our plans to commence mining here in Q1 2010 and take full advantage of the recently signed Wodgina mine infrastructure access agreement."

"Wodgina fits Atlas' project profile perfectly as it provides good potential for a low capex mine with low strip ratios and established infrastructure, very close to a world class port," Mr Flanagan added.

The inferred resource increase is the result of an extensive exploration campaign at Wodgina, consisting of 724 holes for 41,000m of drilling, testing surface iron enrichment within a 1.5 to 5km radius of Talison's crushing and screening plant. Atlas has completed infill drilling on the Anson orebody, and metallurgical test work is underway. This inferred resource total includes 17.5 million tonnes at 57.3% Fe at Anson, which is likely to be the first area to be mined. A new resource estimation, incorporating the closer-spaced infill drilling which will bring Anson to JORC Indicated category, is on track to be delivered in June 2009.

When reported using a 55% Fe cut-off grade, the inferred resource at Wodgina contains a higher grade component of 26.8 million tonnes at 57.6% Fe.
            Wodgina Resource Summary - May 2009---------------------------------------------------------------------Resource        Mt    Fe   CaFe  SiO2   Al2O3   P    S   LOI  Density Classification        (%)  (%)    (%)    (%)   (%)  (%)  (%)  (g/cm3)---------------------------------------------------------------------Inferred       42.73 56.3  61.9   7.0    2.3  0.07 0.05  9.1   3.0---------------------------------------------------------------------
Note: Resources quoted at >53% Fe cut-off grade.
CaFe is calcined Fe calculated by Atlas using the formula (Fe%/(100-LOI))*100

For the full Atlas Iron Announcement, please see the link below;

http://www.abnnewswire.net/media/en/docs/60674-ASX-AGO-447261.pdf

About Atlas Iron Limited

Atlas Iron ASX:AGOAtlas Iron Limited (ASX:AGO) is an independent Australian iron ore company, mining and exporting Direct Shipping Ore (DSO) from its operations in the Northern Pilbara region of Western Australia. Since listing on the ASX in late 2004, Atlas has grown rapidly and is now a member of the ASX100 index.

abnnewswire.com 


Contact

David Flanagan
Managing Director

Andrew Paterson
Geology Manager
Tel: +61-8-9476-7900



ABN Newswire
ABN Newswire This Page Viewed:  (Last 7 Days: 7) (Last 30 Days: 32) (Since Published: 3268) 

View in Other Languages 386432683260 (10392)

googlechart