Monthly Drilling Report - March 2012
Monthly Drilling Report - March 2012

Brisbane, April 4, 2012 AEST (ABN Newswire) - Beach Energy Limited (googlechartASX:BPT) has released the Monthly Drilling Report for March 2012.

AUSTRALIA

Operated Cooper Basin Unconventional Gas Program

In PEL 218 (Beach 100%), workover operations at Encounter-1 have been completed. A diagnostic fracture injection test of the Patchawarra Formation was successfully conducted on 3 April which indicated fracture initiation pressures consistent with the Holdfast-1 well. The main fracture stimulation program will commence in the second half of April, once the fracture stimulation equipment is released from the Moomba-191 well (SACB JV, Beach 20.21%).

The stimulation and evaluation program for Encounter-1 will commence with the treatment of the Patchawarra interval followed by a flow test for a period of up to 30 days. Further details relating to the stimulation of the remaining intervals will be provided at a later date. The information gathered from this program will assist in the design of the horizontal program.

The Moonta-1ST1 well (PEL 218) is currently drilling ahead in the Patchawarra Formation (currently at around 3,500 metres) after delays due to weather and technical issues, which lead to the successful completion of a side track. It is expected that Moonta-1ST1 will take approximately two weeks to reach its planned total depth at the base of the Patchawarra Formation. This well is the first in a campaign of at least five wells designed to delineate the resource potential of the shale and basin centred gas play within the Nappamerri Trough.

The Marsden-1 exploration well (PEL 95, Beach 50%) is being drilled to test the unconventional gas potential of the Permian interval within the Battunga Trough region, approximately 55 kilometres southeast of Moomba. The well is being drilled in the deepest part of the trough and outside of structural closure.

Operated Cooper-Eromanga Oil and Gas

The Haslam-1 exploration well (PEL 106B, Beach 50%) is the fourth planned exploration well in this permit designed to test for stratigraphically trapped gas on the Patchawarra Trough margin, and to gather additional data on the Patchawarra Formation deep coal gas play. The well cored a 28 metre interval of the Patchawarra Formation, recovering approximately 10 metres of Patchawarra coal, which will be evaluated as part of the Joint Venture's unconventional gas strategy in this area. The well has reached a total depth of 2913 metres RT and is currently being evaluated. Southend-1 in PEL 107 (Beach 40%) is the fifth well planned in the current gas exploration campaign.

Senex Operated Cooper-Eromanga Oil - Western Flank

The Thunderchief-1 exploration well was drilled within PEL 104 (Beach 40%) and was plugged and abandoned, with the well intersecting minor oil shows, but failing to intersect reservoir sandstone within the target interval.

The rig has subsequently moved back to PRL 15 to drill an oil development well, Growler-10, approximately 600 metres to the west-southwest of Growler-1. As of this morning it was drilling ahead at a depth of 1729 metres.

Santos Operated Cooper Basin Oil and Gas Development

The Tindilpie-15 gas development well (Beach 20.21%) was drilled, cased and suspended as a future gas producer.

An oil exploration well, Bullamakanka-1, was drilled in ATP 259P (Innamincka Block, Beach 30%). Evaluation of the well indicated no commercial hydrocarbons, resulting in the well being plugged and abandoned.

The Charo-9 oil development well (PPL 177, Beach 20.21%) was successfully cased once access resumed earlier this month. The rig subsequently drilled, cased and suspended Charo-10, in which the target mid-Birkhead reservoir was again successfully intersected. The rig is currently drilling Charo-11.

INTERNATIONAL

Kuwait Energy Operated - Abu Sennan Concession, Egypt

El Salmiya-1 (Beach 22%) has been completed ready for production to an early production facility once the development lease is approved by EGPC. El Salmiya-1 is located approximately 10 kilometres east of the Al Ahmadi-1 and ZZ-4 discoveries and flowed oil, condensate and gas at a combined rate of 5,600 barrels of oil equivalent per day during a test program.

The final two wells in the six well drilling campaign, Salwa-1 and Hawalli-1, have been plugged and abandoned after failing to encounter any significant indications of hydrocarbons. Planning is currently underway for a second round of drilling in Abu Sennan which is expected to commence in the next few weeks.

Strata-X Operated Colorado Unconventional Oil

The Colorado unconventional oil program was acquired through the successful on-market takeover of Adelaide Energy Limited earlier in the year. Slanovich 32-23P (Adelaide Energy 58.3%) is located in Fremont County, Colorado. This well is a follow up to Slanovich 32-23, drilled in 2007, which produced oil from the Cretaceous Niobrara Formation. Slanovich 32-23P is targeting oil in an extensively fractured zone in the shallower Pierre Shale. The well is to be plugged and abandoned after encountering hole stability problems. The joint venture will review the issues before deciding on a forward plan.

The full announcement including Tables, please visit:
http://media.abnnewswire.net/media/en/docs/ASX-BPT-187655.pdf

Contact

Beach Energy Limited
T: +61-8-8338-2833
F: +61-8-8338-2336
WWW: www.beachenergy.com.au



ABN Newswire
ABN Newswire This Page Viewed:  (Last 7 Days: 8) (Last 30 Days: 24) (Since Published: 2404)