Indago Energy Ltd

ASX:INK ISIN:AU000000INK8

Indago Energy Limited ASX INKIndago Energy Ltd (ASX:INK) (OTCMKTS:POGLY) is an Australian listed company engaged in oil and gas exploration, development and production. Indago's project portfolio includes liquid rich producing assets together with substantial oil development and exploration acreage in the United States.

The Company's Exploration and Production focus is on high growth oil and gas projects offering scalability of production, cash flows and reserves. Indago currently has several producing projects together with a significant acreage position. The Company's immediate focus is the development of its Capitola Oil Project located in an active region of the Cline Shale resource play along the Eastern Shelf of the Permian Basin, Texas. The project's core development and exploitation opportunities are shallower multiple "stacked" sandstones and limestones to depths of 7,000 feet which are effectively produced from vertically drilled wells. Indago's value driven model is executed through exploiting shallower, well defined intervals with advanced completion and stimulation technology within known produced oil fields together with exposure to the emerging Cline Shale resource play.

Indago's shares are publicly traded on the Australian Securities Exchange (ASX ticker: INK) and also as American Depositary Receipts on the OTCQX (ADR ticker: POGLY).

 
   

News

Pryme Energy Limited (ASX:PYM) (POGLY) Drilling of Second well in Capitola Oil Project Underway

🕔10/21/2014 10:54:21 AM 2813

Drilling of the McCain 189-F1 well, the first to be drilled in the Claytonville acreage block within the Capitola Oil Project is underway with a second drill rig. The well will be drilled to a target depth of 7,300 feet (2,225 metres) vertically and will intersect multiple stacked objectives including the productive Canyon Sands

Read Full Article

Pryme Energy Limited (ASX:PYM) (POGLY) First Well in Capitola Project Reaches Total Depth

🕔10/20/2014 10:37:21 AM 2597

Pryme Energy Limited (ASX:PYM) (OTCMKTS:POGLY) is pleased to announce that the first well to be drilled in the Capitola Oil Project, the Mahaffey Bishop PU 1 in the Sweetwater acreage block, has reached its total depth of 6,090 feet (1,856 metres.)

Read Full Article

Pryme Energy (ASX:PYM) (OTCMKTS:POGLY) Drilling Underway in Capitola Oil Project

🕔10/10/2014 10:21:36 AM 2544

The Mahaffey Bishop PU1 is the first of three Capitola Oil Project wells planned for October. It will be drilled vertically and will intersect multiple stacked objectives including the Canyon Sand series and the Cline Shale along with several other secondary targets.

Read Full Article

Pryme Energy Limited (ASX:PYM) Re-negotiation of Credit Facility

🕔9/19/2013 8:48:47 AM 4503

Pryme Energy Limited (ASX:PYM) announce that the drilling of the Rosewood Plantation 21H well in the Turner Bayou project was funded by way of a non-recourse credit facility (Term Facility) provided by Macquarie Bank Limited. The loan security is limited to the Turner Bayou project assets and the company's other assets, including cash holdings, are excluded.

Read Full Article

Pryme Energy Limited (ASX:PYM) June 2013 Quarterly Cashflow and Activities Report

🕔7/26/2013 1:39:33 PM 4075

Pryme Energy Limited (ASX:PYM) announce the June 2013 Quarterly Cashflow and Activities Report.

Read Full Article

Pryme Energy Limited (ASX:PYM) Turner Bayou Operations Update

🕔6/14/2013 12:49:33 PM 4072

Pryme Energy Limited (ASX:PYM) advise the following update with highlights regarding the Turner Bayou Operations.

Read Full Article

Pryme Energy Limited (ASX:PYM) March 2013 Quarterly Cashflow and Activities Report

🕔4/30/2013 11:29:27 AM 4006

Average net daily sales to Pryme Energy Limited's (ASX:PYM) account for the March quarter were 69 Bbls/day of oil and 110 Mcfd of natural gas (88 BOE/day). This represents an increase of 2.2% from the December 2012 quarter

Read Full Article

Pryme Energy Limited (ASX:PYM) Chairman's Address to Shareholders

🕔4/24/2013 11:02:26 AM 5484

The past year has been a challenging one for Pryme Energy Limited (ASX:PYM) and its shareholders. Our main focus for the year was the Turner Bayou project in Avoyelles Parish, Louisiana where we have been targeting the Austin Chalk formation.

Read Full Article

Pryme Energy Limited (ASX:PYM) Rosewood Plantation 21H No.1 Update

🕔3/22/2013 12:20:19 PM 4432

Pryme Energy Limited (ASX:PYM) announce that the Rosewood Plantation 21H No.1 well is currently shut-in for installation of a device to measure and record bottom hole pressures.

Read Full Article

Pryme Energy Limited (ASX:PYM) Rosewood Plantation 21H No.1 Production Update

🕔3/11/2013 9:53:23 AM 4229

Pryme Energy Limited (ASX:PYM) announce that the flow back operation on the Rosewood Plantation 21H No. 1 well has been underway since last Monday night (Brisbane, Australia time). The objective of the operation has been to clean up the well and establish a stable rate of production.

Read Full Article
###

92,870 COMPANY PROFILE VIEWS

  • This Page Viewed: (Last 7 Days: 236) (Last 30 Days: 707) (Since Published: 92870) 

Company Data

    Headquarters
  • Level 6
    412 Collins Street
    Melbourne, Victoria, 3000
    Australia
  • Telephone
  • +61-3-9642-2899 
  • Fax
  • +61-3-9642-5177 
  • Principal Sector
  • Energy 
  • Principal Industry
  • Energy 
  • Homepage
  • www.pryme-energy.com

Company Reports

Audio Interview

Presentations

Download Presentation

Quarterly Report

Download Presentation

Social Media