Beach Energy Limited Stock Market Press Releases and Company Profile
Beach Petroleum Limited
Beach Petroleum Limited

Perth, Mar 6, 2009 AEST (ABN Newswire) - Beach Petroleum Limited (ASX:BPT)(PINK:BEPTF) drilling report and well location map for the week ending 4 March, 2009. Highlights of the week's activities include:

Beach Petroleum Operated Cooper / Eromanga Exploration and Development

Perlubie-1 (PEL 92) has been completed as an oil producer and free-flowed on test at 2600 bopd without water. This finishes a three well completion program of the PEL 92 / PPL 220 Joint Venture's recent exploration and appraisal program. Callawonga-5 and Callawonga-6 were also completed as oil producers and flowed at a combined rate of 6600 bopd with traces of water. The Callawonga wells are now producing into the production system with Perlubie-1 to be connected in the 2nd quarter, 2009. Interests in PEL 92 and PPL 220 are Beach Petroleum Ltd (75%) and Cooper Energy Ltd (25%).

Egypt - South East July Concession - Gulf of Suez

South July-1, targeting oil in the Lower Rudeis and Nubia Formations is at a depth of 3773 metres. Acquisition of the intermediate wireline log suite has been completed. The current operation is attempting to free stuck drill pipe prior to drilling ahead. Interests in South July-1 are Beach Petroleum (Egypt) Pty Limited, 20%, Santos Egypt Pty Ltd, 40% and Dana Petroleum (E&P) Limited, 40%.
-----------------------------------Well                  Participants-----------------------------------South July-1          BPT    20.00%SE July Concession    STO*   40.00%Oil Exploration       DNX    40.00%Gulf of Suez,  Egypt---------------------------------------------------------------Weekly Progress & Summary                       Primary Targets---------------------------------------------------------------Report Time: 0600hrs (Egypt) 4/03/2009          Rudeis FmDepth:       3773m                              Nubia SstOperation:   Attempting to free stuck drill pipe.Progress:    16m--------------------------------------------------------------------------------------------------Well                  Participants-----------------------------------Mudrangie Sth-1       BPT    20.21%PPL 196               STO*   66.60%Oil/Gas Development   ORG    13.19%C/E Basin, SA---------------------------------------------------------------Weekly Progress & Summary                       Primary Targets---------------------------------------------------------------Report Time: 0600 hrs (AEST) 4/03/2009          Patchawarra FmDepth:       3223m (TD)                         Tirrawarra SstOperation:   Well to be cased and suspended as a future Tirrawarra              Sandstone and Patchawarra Formation gas producer.Progress:    165m--------------------------------------------------------------------------------------------------Well                 Participants-----------------------------------Fly Lake-26          BPT     20.21%PPL18                STO*    66.60%Gas Development      ORG     13.19%C/E Basin, SA---------------------------------------------------------------Weekly Progress & Summary                       Primary Targets---------------------------------------------------------------Report Time: 0600 hrs (CST) 4/03/2009           Patchawarra FmDepth:       1071mOperation:   Drilling ahead in the Cretaceous.Progress:    217m------------------------------------------------------------------------------------------------COAL SEAM GAS PROJECTSLocation             Participants---------------------------------PLA 258              BPT   40%Coal Seam Develop't  AOE*  60%Surat  Basin, QLD----------------------------------------------------------------Well           Depth     Operation: 0600hrs (EST) 4th March 2009----------------------------------------------------------------Meenawarra-11  465m(TD)  Well has been completed. Rig moved to                         Meenawarra-12.------------------------------------------------------------------------------------------------COAL SEAM GAS PROJECTSLocation             Participants--------------------------------PLA 258              BPT   40%Coal Seam Develop't  AOE*  60%Surat  Basin, QLD----------------------------------------------------------------Well           Depth     Operation: 0600hrs (EST) 4th March 2009----------------------------------------------------------------Meenawarra-12  410m      Drilling ahead in production zone----------------------------------------------------------------
* Operator
(s) Secondary Targets
DNX Dana Petroleum (E&P) Limited
BPT Beach Petroleum Ltd
ORG Origin Energy Resources LTD
AOE Arrow Energy NL
STO Santos Limited

Contact

Hector Gordon
Chief Operating Officer
TEL: +61-8-8338-2833



ABN Newswire
ABN Newswire This Page Viewed:  (Last 7 Days: 4) (Last 30 Days: 9) (Since Published: 1537)