Beach Petroleum Limited
Perth, Mar 6, 2009 AEST (ABN Newswire) - Beach Petroleum Limited (ASX:BPT)(PINK:BEPTF) drilling report and well location map for the week ending 4 March, 2009. Highlights of the week's activities include:
Beach Petroleum Operated Cooper / Eromanga Exploration and Development
Perlubie-1 (PEL 92) has been completed as an oil producer and free-flowed on test at 2600 bopd without water. This finishes a three well completion program of the PEL 92 / PPL 220 Joint Venture's recent exploration and appraisal program. Callawonga-5 and Callawonga-6 were also completed as oil producers and flowed at a combined rate of 6600 bopd with traces of water. The Callawonga wells are now producing into the production system with Perlubie-1 to be connected in the 2nd quarter, 2009. Interests in PEL 92 and PPL 220 are Beach Petroleum Ltd (75%) and Cooper Energy Ltd (25%).
Egypt - South East July Concession - Gulf of Suez
South July-1, targeting oil in the Lower Rudeis and Nubia Formations is at a depth of 3773 metres. Acquisition of the intermediate wireline log suite has been completed. The current operation is attempting to free stuck drill pipe prior to drilling ahead. Interests in South July-1 are Beach Petroleum (Egypt) Pty Limited, 20%, Santos Egypt Pty Ltd, 40% and Dana Petroleum (E&P) Limited, 40%.
-----------------------------------Well Participants-----------------------------------South July-1 BPT 20.00%SE July Concession STO* 40.00%Oil Exploration DNX 40.00%Gulf of Suez, Egypt---------------------------------------------------------------Weekly Progress & Summary Primary Targets---------------------------------------------------------------Report Time: 0600hrs (Egypt) 4/03/2009 Rudeis FmDepth: 3773m Nubia SstOperation: Attempting to free stuck drill pipe.Progress: 16m--------------------------------------------------------------------------------------------------Well Participants-----------------------------------Mudrangie Sth-1 BPT 20.21%PPL 196 STO* 66.60%Oil/Gas Development ORG 13.19%C/E Basin, SA---------------------------------------------------------------Weekly Progress & Summary Primary Targets---------------------------------------------------------------Report Time: 0600 hrs (AEST) 4/03/2009 Patchawarra FmDepth: 3223m (TD) Tirrawarra SstOperation: Well to be cased and suspended as a future Tirrawarra Sandstone and Patchawarra Formation gas producer.Progress: 165m--------------------------------------------------------------------------------------------------Well Participants-----------------------------------Fly Lake-26 BPT 20.21%PPL18 STO* 66.60%Gas Development ORG 13.19%C/E Basin, SA---------------------------------------------------------------Weekly Progress & Summary Primary Targets---------------------------------------------------------------Report Time: 0600 hrs (CST) 4/03/2009 Patchawarra FmDepth: 1071mOperation: Drilling ahead in the Cretaceous.Progress: 217m------------------------------------------------------------------------------------------------COAL SEAM GAS PROJECTSLocation Participants---------------------------------PLA 258 BPT 40%Coal Seam Develop't AOE* 60%Surat Basin, QLD----------------------------------------------------------------Well Depth Operation: 0600hrs (EST) 4th March 2009----------------------------------------------------------------Meenawarra-11 465m(TD) Well has been completed. Rig moved to Meenawarra-12.------------------------------------------------------------------------------------------------COAL SEAM GAS PROJECTSLocation Participants--------------------------------PLA 258 BPT 40%Coal Seam Develop't AOE* 60%Surat Basin, QLD----------------------------------------------------------------Well Depth Operation: 0600hrs (EST) 4th March 2009----------------------------------------------------------------Meenawarra-12 410m Drilling ahead in production zone----------------------------------------------------------------
* Operator
(s) Secondary Targets
DNX Dana Petroleum (E&P) Limited
BPT Beach Petroleum Ltd
ORG Origin Energy Resources LTD
AOE Arrow Energy NL
STO Santos Limited
Contact
Hector Gordon
Chief Operating Officer
TEL: +61-8-8338-2833
| ||
|