Corporate
- Group available cash at the end of the quarter was $1.74 million and now stands at about $2.2 million
Sales & Operations
- Sales in the quarter totalled 978 tonnes as part of regular sales of fertiliser grade bauxite
- A letter of intent to supply chemical-grade bauxite was signed for treatment of industrial waste water in Bangladesh
- A tender submission for a cement-grade bauxite shipment was completed and samples of a suite of products provided for customer assessment
Bauxite Refining Technology
- ABx incorporated ALCORE Limited as a wholly owned subsidiary to fund and manage the ALCORE Project, leading to the construction of an ALCORE Production Plant to produce Aluminium Fluoride (AlF3) & valuable co-products
- ALCORE technology is used to beneficiate and refine raw bauxite with a market price of $50 into high-value products worth more than $US 800 per tonne, including:
a. Aluminium Fluoride (AlF3) used as an electrolyte for aluminium smelters & lithium ion batteries;
b. Silica fume for our cement industry customers and manufacturers of low-CO2 geopolymer cement;
c. Corethane which is an ultra-pure hydrocarbon that can substitute for natural gas for electricity and industrial heat generation and can be used for metallurgical use and brickmaking; and,
d. Refractory-grade bauxite & potentially high purity alumina (HPA) for making scratch-resistant sapphire glass.
- ALCORE will be the first Australian supplier of AlF3 to the Australasian Aluminium Smelters
- Funding is in place to complete Stage 1, scheduled to take 3 months for final design (now completed), 1 month for final permitting, followed by 3 months construction and up to 5 months of production.
- ALCORE completed on schedule, the design of the Stage 1 plant the ALCORE Research Centre at Berkeley Vale on the NSW Central Coast and has now acquired the required equipment
- Production of AlF3 test samples could commence before year-end, well ahead of schedule
- Once sufficient AlF3 is produced for rigorous testing, the pilot plant will test the production of Corethane, which will provide the fuel for heat and electrical power for the ALCORE Production Plant and will also demonstrate its use as a gas-substitute in gas turbine electrical generators and its use as a diesel substitute for fuel security purposes. Corethane has significant energy and industrial potential
- ALCORE technology is relatively low-risk because it operates at ambient temperatures and pressures
- The ALCORE business plan targets long-established, broad industrial markets with many potential buyers
- Subject to regulatory, statutory and shareholder approvals as required, the ALCORE project is holding discussions with governments, agencies and companies that have showed strong interest in both AIF3 and the main co-products, Corethane and silica fume.
To view the full report, please visit:
http://abnnewswire.net/lnk/K7I24N46
About ABx Group Limited
ABx Group Limited (ABx) (ASX:ABX) is a uniquely positioned Australian company delivering materials for a cleaner future.
The three priority projects are:
- Heavy rare earths: Supplying light and heavy rare earths from Tasmania into Western supply chains
o Processing Options Analysis conducted in partnership with external experts
- Clean fluorine chemical production: Producing industrial chemicals from aluminium smelter by-product (ALCORE)
o Continuous pilot plant under construction in Bell Bay, Tasmania
- Near-term bauxite production: Mining bauxite resources for the aluminium, cement and fertiliser industries
o Agreements executed with Good Importing International for bauxite projects in Queensland and New South Wales, and $2.7 million initial payment has been received
o Approvals well advanced for DL130 bauxite project in northern Tasmania
ABx endorses best practices on agricultural land and strives to leave land and environment better than we find it. We only operate where welcomed.
| ||
|