Carnarvon Petroleum Limited (ASX:CVN) Phoenix South-3 Drilling Update
Carnarvon Petroleum Limited (ASX:CVN) (OTCMKTS:CVONF) is pleased to provide the following update on the drilling of the Phoenix South-3.
Carnarvon Petroleum Limited (ASX:CVN) (OTCMKTS:CVONF) is pleased to provide the following update on the drilling of the Phoenix South-3.
Central Petroleum Limited (ASX:CTP) announces drilling continues without incident and is currently at 2274m MD, with another 700m to go. Logs will be run from 2360m MD to evaluate completion options in the Lower Stairway 2.
Central Petroleum Limited (ASX:CTP) as operator of the Mereenie Joint Venture announcesWest Mereenie 26 has reached the targeted Lower Stairway 2 sandstone as confirmed by cutting samples and logging while drilling Gamma Ray log.
Central Petroleum Limited (ASX:CTP) today has executed a Gas Sales Agreement with Incitec Pivot Limited whereby Central will deliver at least 20 TJ/d of gas to IPL on an ex-field basis from its Palm Valley and Mereenie fields. The gas will be delivered from the commencement of commercial operations on the Northern Gas Pipeline (currently anticipated to be December 2018) till 31 December 2019.
Liquefied Natural Gas Limited (ASX:LNG) (OTCMKTS:LNGLY) through its 100% owned project company, Magnolia LNG, LLC and Meridian LNG Holdings Corporation (Meridian LNG) have agreed to extend the financial close date of their legally binding offtake agreement to 30 September 2018. This three-month extension continues to allow both parties to maintain commercial flexibility.
Carnarvon Petroleum Limited (ASX:CVN) (OTCMKTS:CVONF) is pleased to provide the following update on the drilling at the Dorado-1 well.
EON NRG Ltd (ASX:E2E) (OTCMKTS:ICRMF) provides the Company's latest Presentation.