Carnarvon Petroleum Limited (ASX:CVN) Quarterly Report March 2018
Carnarvon Petroleum Limited (ASX:CVN) (OTCMKTS:CVONF) provides the Company's Quarterly Report for the period ending 31st March, 2018.
Carnarvon Petroleum Limited (ASX:CVN) (OTCMKTS:CVONF) provides the Company's Quarterly Report for the period ending 31st March, 2018.
Central Petroleum Limited (ASX:CTP) advises that the Ensign Rig is expected to be fully at the site at Mereenie by next week. The rig crew have been selected with the site preparation continuing apace. It is anticipated that West Mereenie-26 will be spudded on 20 to 21 April and the drilling will take 35 to 40 days.
Eon NRG (ASX:E2E) (OTCMKTS:ICRMF) advises that 24 lode claims prospective for Cobalt have been staked by the Company's Geologist within close proximity of the original 18 existing claims in the Stillwater Range (Table Mountain District). Eon now has exploration rights over 42 lode claims which cover 840 acres of land and includes the historic Gilberts silver, gold and lead mine.
Central Petroleum Limited (ASX:CTP) has undertaken a review of the maximum delivery capability of the existing Palm Valley wells to determine what production rates could be achieved without considering the Palm Valley-13 well, which will be drilled this fiscal year.
Carnarvon Petroleum Limited (ASX:CVN) (OTCMKTS:CVONF) is pleased to provide the following update on its near-term drilling program as advised by the operator, Quadrant Energy.
This annual report is of the group comprising Eon NRG Limited (ASX:E2E) (OTCMKTS:ICRMF) and its subsidiaries. The Group's functional and presentation currency is US Dollars ($). Unless otherwise stated, all amounts in the Annual Report are in US Dollars.
Central Petroleum Limited (ASX:CTP) (OTCMKTS:CPTLF) welcomes today's final determination from the ACCC to authorise joint marketing of Mereenie gas for the Mereenie Joint Venture for three years.